The floor you see is only as good as the surface under it. Subfloor preparation is the work that happens after the old covering comes up and before the new floor goes down.
It is quoted for what the subfloor actually needs, which is why we look at it before pricing rather than assuming a number.
The subfloor is inspected for flatness, movement, damaged sections and anything left behind by the previous floor.
High and low spots are found across the room, not judged by eye, because most floating floors and large tiles are unforgiving of both.
Low areas filled and high areas eased so the finished floor sits flat and quiet.
Loose panels re-fastened where a squeak or movement is coming from the subfloor rather than the floor above it.
Concrete is checked before a floor that would be affected by moisture is installed over it.
The underlay or barrier the chosen floor calls for, fitted as part of the same visit.
Carpet or tile has come up and the surface underneath has adhesive, staples, patching or an obvious dip in it.
A floating floor is going down, a large-format tile is being set, or the old floor had a soft or noisy spot that nobody ever traced.
Preparation is part of the flooring quote rather than a surprise added later. If lifting the old floor reveals something the measure could not see, you hear about it at the time, with what it changes.
This is floor preparation, not structural work. Where a subfloor problem looks structural — a failing joist, a settling floor system — we say so and recommend the right trade rather than levelling over it.
Click-together floors bridge dips instead of following them, which is what makes a floor feel springy or click underfoot. Tile telegraphs the same dips as lippage between tiles. Flattening the surface first is more affordable than living with either.
Partly. We can see the room, the doorways and the age of the build, and we lift a corner where we can. The full picture arrives when the old floor is off, and anything that changes the scope is discussed then.
Where a squeak comes from the subfloor moving against its fasteners, re-fastening it can be included in your written preparation scope while the floor is open. Sounds can also come from joists, framing, ducts or plumbing, so we cannot promise that every noise will stop. A squeak coming from the structure below is a different job, and we will tell you which one you have.
Estimates are free, carried out at your home, and given in writing before anything is ordered.