Full House Renovation in Bolton, Ontario

Two bathrooms, the kitchen, popcorn ceilings off and pot lights in, new engineered hardwood, the staircase sanded and refinished, paint, trim and new doors — one house, six weeks.

Project at a glance

Flooring

Flooring
Engineered hardwood, upstairs & main floor
Material dimensions
6-1/2" x 3/4"
Total area
2,500 sq. ft.
Installation method
Nail down over a vapour & moisture barrier
Demolition
Existing tile, hardwood & parquet removed; subfloor prepared

Staircase

Stairs
Sanding, staining & varnishing
Total steps
13 hardwood steps
Pickets
New metal pickets
Posts
New hardwood square posts
Railing
Existing railing — sanded, stained & varnished
Stringers & risers
Piano style

Kitchen

Preparation
Old kitchen removed & disposed of; plumbing and electrical rough-ins to the new layout; duct work, drywall, mudding & taping
Supplied & installed
HDF painted cabinets, quartz countertop, quartz backsplash, stainless sink and island

Two bathrooms

Demolition
Old tile, vanities, bathtubs and toilets removed
Showers
New shower and waterproofing; one tub removed to create a walk-in shower
Supplied & installed
Tile, vanities, mirrors, faucets, accessories, shower kits, a freestanding tub, toilets, glass doors, niches and finishes
Trades
Plumbing and electrical managed by one company

Throughout the house

Trims
5-1/4" modern bevel baseboards with shoe moulding; door & window trim
Painting
Whole house (OC-17 Dove White)
Wainscotting
New, on the stair hallway & master bedroom
Popcorn removal
Whole house
Pot lights
New, supplied & installed
Duct & furnace cleaning
Included

Project

Location
Bolton, ON
Project duration
6 weeks

The finished home

What It Looks Like Now

Six rooms out of one renovation. The house as it was handed back, finished to sit together rather than to be admired one room at a time.

The staircase, from the entry.
The finished kitchen.
Tub, shower, and the tile behind both.
The length of the upper hall.
The waterfall end, and the glass uppers.
After — the same landing, ceiling flat and lights in.

How it came about

The Story of This Project

March 2024

This one started a long time before the work did. We first met the homeowner in March 2024, when she was still working out what she wanted to do with the house — looking at materials, comparing finishes, trying to get a picture of what a renovation this size actually involves.

She had come in thinking about flooring and stairs, and had not realised how much of the rest we could take on. That first conversation ran close to three hours: materials, finishes, what order the trades have to go in, and what living through it would really be like, room by room.

She was not ready to decide, and there was no reason she should have been. She kept planning, and she kept talking to other contractors. We left it there.

June 2025

She called back fifteen months later. She remembered the afternoon we had spent explaining how the thing works, and this time she had made her decision. She asked us to take the renovation on.

That is the part of this job worth saying out loud. When someone plans a renovation for over a year and then hands you the house and the money they saved for it, the brief is not really the scope list. It is to make the decision look like a good one.

The renovation

What followed was the whole house. Two bathrooms taken back and rebuilt. The kitchen. The popcorn ceilings off and pot lights in. New engineered hardwood through the floors. The staircase sanded and refinished, its railing sanded, stained and varnished, and new metal pickets and hardwood square posts in place of the old turned spindles. Paint, new trim and panel mouldings, and new interior doors.

We ran it as one renovation rather than eight jobs handing off to each other. That is what kept the rooms consistent and the schedule honest. Despite the breadth of the project, the coordinated renovation was completed in six weeks.

The kitchen

The Kitchen, Rebuilt

The old kitchen came out entirely, and the plumbing and electrical were roughed in to the new layout before any cabinet went back. Painted HDF cabinetry, a quartz countertop, and the same quartz carried up the wall as the backsplash so the joint between the two disappears.

The island and the range wall.
From the dining end.
The hood wall, and the slab carried up it.

Two bathrooms

Both Taken Back and Rebuilt

Both bathrooms went back to the board — old tile, vanities, tubs and toilets out, then waterproofing, then large-format tile, then the fittings. In the ensuite the tub was moved off the wall and a walk-in shower built in its place.

The ensuite from the doorway.
The vanity wall.
The finished ensuite — the glass shower, the freestanding tub and the tile behind both.No sound
The ensuite again — the backlit mirror, the vanity and the run of tile to the shower.No sound
During the work — fitting the ensuite vanity.No sound

Flooring and stairs

Sanded Back, Refinished, Rerailed

The staircase is the original one. It was sanded back to bare wood, stained and varnished in place, and its railing was refinished with it; the old turned spindles came out for new metal pickets and new hardwood square posts. New engineered hardwood runs through the upper hall and the main floor, and the panel mouldings beside the flight were cut to follow a curved wall, which is slower work than it looks.

The flight, and the panelled curve.
The upper landing.
Down the curve.
Mouldings cut to the curve.
From the hall below.
Hall, lights and balustrade.
After — the same void, refinished railing, new pickets and panelled walls.
The landing, in daylight.
Over the balustrade, in daylight.
The hall, in daylight.

Behind the finish

The Work You Stop Seeing

Waterproofing, substrate preparation, levelling clips, mouldings, protection. None of it is visible in a finished photograph, and all of it is why the finished photograph holds up.

Levelling clips, holding every tile flat to the next.
Tiled and draining, before the glass.
The mouldings going on.
Wrapped, while everything around it was finished.
The kitchen, part way in.

Before and after

Four Views, Before and After

Four comparisons, each shot from the same place in the house twice. A stippled ceiling, plain unpanelled walls, the original turned spindles and a bare landing edge on the left; a flat ceiling with pot lights, a refinished railing, new metal balusters, panel mouldings and new hardwood on the right.

Before

Before — the stippled ceiling, and the old railing.

After

After — the same landing, ceiling flat and lights in.

Before

Before — the plain wall and the old railing.

After

After — the same void, refinished railing, new pickets and panelled walls.

Before

Before — the stairwell from the top landing.

After

After — the same view, finished.

Before

Before — the flight from the hall, mid-renovation.

After

The staircase, from the entry.

Before

Before the Renovation

The house as we found it.

Before — back to the board.
Before — down to the subfloor.

On video

Three Clips, No Sound

Two walkthroughs of the finished rooms and one of the bathroom tile going on. Nothing downloads until you press play.

Through the finished primary ensuite — tile, tub, shower and the light around them.No sound
The upper landing and the refinished railing, from the top of the flight.No sound
During the work — setting the bathroom tile.No sound

Before you call

Questions This Project Answers

The ones people ask when they are weighing up a job this size.

The renovation as one project

Can one company really handle a whole-house renovation?

That is what this project was. Two bathrooms, the kitchen, the ceilings, the lighting, the floors, the staircase, the paint, the trim and the doors were run as one renovation on one schedule, rather than as separate trades handing off to each other. The coordination is what keeps the rooms consistent and stops the calendar sprawling.

How long does a renovation like this take?

This one was completed in six weeks. How long yours takes depends on how many areas are in scope and how much preparation is hiding behind the finishes — which is something we would rather find during the estimate than halfway through.

Do we have to move out while the work is going on?

It depends on how much of the house is in scope at once. When the floors, the ceilings and both bathrooms are open at the same time, most people find it easier to be elsewhere for the heaviest stretch. That is a conversation to have at the estimate, because the answer changes the order the rooms are done in.

The staircase

Was the staircase replaced or refinished?

Refinished. The original stair stayed where it was: sanded back to bare wood and refinished in place. What was replaced is the balustrade — the old turned spindles came out for new metal pickets and new hardwood square posts, and the railing itself was sanded, stained and varnished with the treads.

When is refinishing the right call instead of a new staircase?

When the structure underneath is sound. A stair that is solid and quiet but dated is a refinishing job; the treads come back to bare wood and take a new colour, and the balustrade can change independently. A stair that moves, squeaks badly or was built wrong is a different conversation. We would rather look at it than guess, and our stair renovation page covers both paths.

What is the panel moulding around the stairwell?

Trim applied to the wall in rectangles, then painted with the wall so it reads as part of it. On this staircase it follows a curved wall, which means every piece is cut and fitted to that curve rather than run straight. It is slower work than it looks in a photograph, and it is most of the reason the stairwell reads as finished rather than merely painted.

Ceilings, lighting and paint

What is involved in taking a popcorn ceiling off?

The stipple comes off, then the surface underneath is skim-coated, sanded, primed and painted. If pot lights are going in, they go in during that sequence rather than after it, so the ceiling is finished once instead of patched twice. Our popcorn ceiling removal page covers what that involves.

Why put the pot lights in at the same time as the ceiling?

Because a pot light is a hole in a ceiling. Cutting it before the ceiling is skim-coated and painted means the patching around it happens once, as part of the finish. Adding lights to a ceiling that is already painted means opening it again, and the repair is visible under exactly the light you just installed.

Does the whole house have to be painted the same colour?

No, and it usually should not be. What matters is that the colours are chosen together so the rooms sit beside each other well, and that ceilings and trim are consistent throughout. That consistency is a large part of why a house reads as one renovation rather than several.

The kitchen and the bathrooms

What has to happen before a kitchen can be installed?

The room has to be right first. On this project the kitchen was extended, so the walls, the ceiling, the electrical and the surfaces underneath were all finished before a single cabinet went in. Cabinetry installed against an unfinished room needs pulling back out, which is the expensive way to find that out.

Why does waterproofing matter if the tile is waterproof?

Porcelain tile is waterproof; a tiled wall is not. Water gets past grout and through movement joints over time, and what stops it reaching the structure behind is the membrane. It is invisible the day the job finishes, and it is the part that decides whether the bathroom is still sound in ten years. Our bathroom renovation page goes further into it.

Do two bathrooms in one house have to match?

No. On this project they did not. Both were taken back to the board and rebuilt, but the second bathroom got its own decisions rather than a smaller copy of the first. Rooms that answer to their own size and light tend to look considered; rooms that copy each other tend to look like one was an afterthought.

Looking back, the thing that stands out is not how many rooms changed. It is that this began with one long conversation in 2024, survived fifteen months of the homeowner thinking it over, and ended with a house she had trusted us to finish from one end to the other.

Next step

Planning a larger renovation?

Flooring, stairs, bathrooms, a kitchen, ceilings and paint can run as one project on one schedule rather than as several trades handing off to each other. Come and see the materials at our Bolton showroom, or have us measure your home and put a price in writing. Estimates are free and there is no obligation.