A textured ceiling dates a room faster than almost anything else in it, and it is one of the few changes that alters how a whole floor of a house reads.
We remove the texture, repair what is underneath and leave the ceiling finished — usually while the room is already open for flooring or renovation work.
Floors, walls and anything staying in the room covered and sealed off before work starts.
The textured coating taken off the ceiling surface.
Seams, dents and old patches made good so the flat ceiling reads as one plane.
The ceiling primed and finished in the agreed colour.
Debris removed and the room returned to a workable state.
A room is being renovated or re-floored and the ceiling is the last thing still showing its age.
Pot lights are going in, which is the natural moment to deal with the ceiling surface at the same time.
It is dusty work, so it is sequenced before flooring and finishing wherever the project allows. Where the ceiling turns out to need more repair than the surface suggested, you hear it at the time with what it changes.
Textured ceilings in older homes can contain materials that need testing before they are disturbed. We do not test for or remove hazardous materials. Where the age of the house makes that a question, have the ceiling tested first — we will work to the result.
Anything that can leave the room should. What stays is covered and sealed, but a clear room is faster, cleaner and more affordable to protect.
That is the sensible order — the ceiling is already open and protected. See Pot Lights.
It is repaired and skimmed to read flat under normal room lighting. A ceiling that has been patched many times over the years may need more repair work, which we would discuss with you rather than absorb quietly.
Estimates are free, carried out at your home, and given in writing before anything is ordered.