We supply the floor and install it with our own crew, so the material, the preparation underneath it and the trim around it are one job rather than three separate conversations.
Every floor is measured on site before it is ordered, because the layout, the doorways and what is already on the subfloor decide as much as the product does.
Rooms measured, the starting wall and plank direction agreed, and waste allowed for before anything is ordered.
Lifting the old covering, staples, tack strip and adhesive residue where that is part of the scope.
The subfloor is checked for flatness, fasteners and moisture, and prepared for the floor going on it.
Nail-down, glue-down, floating or set in mortar — whichever the product and the subfloor call for.
Thresholds, quarter round or baseboard, and the nosing where the floor meets a staircase.
Off-cuts and packaging removed, and the finished floor walked with you before it is called done.
A floor is being replaced, a room is being added to an existing floor, or a renovation has reached the point where the flooring goes in.
It is also the stage where problems under the old floor surface — an uneven slab, a squeaking subfloor, moisture — are found and raised with you rather than covered up, and any corrective work is added to your written scope before it is done.
The measure, the material and the installation are handled by the same company, so there is one point of contact when something needs a decision. If the subfloor needs work, we tell you at the measure and it goes in the written estimate, not on the invoice afterwards.
We prefer to supply and install together, because the responsibility for the product and the installation then sits in one place. Talk to us about the floor you have in mind and we will tell you plainly whether we can take it on.
Usually, yes. Some floating floors can go over a sound existing surface, but that depends on the height it adds at doorways and appliances, and on what is underneath. It is one of the things we check at the measure.
Yes, and it is the easier way to do it — one measure, one crew and one set of colour decisions, with the stair nosing matched to the floor rather than to it afterwards. See Stair Renovation.
The Flooring Mart provides a two-year limited workmanship warranty on eligible flooring installations. It covers verified installation failures caused directly by our workmanship. Product defects, normal wear, structural or subfloor movement, moisture originating outside our work, and conditions outside the agreed installation scope are excluded. Read the complete flooring installation warranty terms.
Your installation date is confirmed in writing when you accept your estimate. Ask us about current scheduling.
Estimates are free, carried out at your home, and given in writing before anything is ordered.